To the central content area

Industrial Area Sewerage System Management and Counseling Program

Absrtact
This is a one-year administrative assissting project,the major tasks including:(1)assising to estabilsh CWMS(2)auduitng the industrial area sewerage system controlling status(3)planning water pollution prevention benchmarking performance indicators(4)studying how to elevate the utilization rate and pollution quantity reduction(5)assisting the EPB to conduct funtional inspection and to improve the inspection skill(6)other administractive assistance works.
Keyword
Industrial Park;Continuous Water Monitoring System(CWMS);Functional Inspection;RATA;data consistency analysis between permit & DMR;feasibility study;functional inspection
Open
top